DAF (Dissolved Air Flotation)
REFERENCE
Client | Location | Project Title | Service | Capacity | Period |
---|---|---|---|---|---|
DHIC | Kuwait | [Doha Ph.1 SWRO] DAF Pilot System | E, M, C, I | 85㎥/h x 1set | 2017 |
ENPURE | Singapore | [TUAS3 Desalination Plant] Saturator vessel | E, M | 23㎥ x 6sets | 2016 |
ENPURE | Philipphines | [Putatan WTP] Saturator vessel | E, M | 22㎥/h x 2sets | 2015 |
DHIC | Saudi Arabia | [DTRI] DAF Pilot System | E, M, C, I | 60㎥/h x 1set | 2015 |
DHIC | Saudi Arabia | [DTRI] NBG Pilot System | E, M, C, I | 60㎥/h x 1set | 2014 |
ENPURE | Saudi Arabia | [Shuqaiq Steam power] Saturator vessel | E, M | 5㎥ x 2sets | 2014 |
DHIC | Korea | [Busan Gijang SWRO] Equipment for DAFB | E, M, I | 4,300㎥/h | 2012 |
DHIC | Mexico | [Rosarito] DAF Pilot System | E, M, C, I | 20㎥/h x 1set | 2012 |
* E : Design / M : Manufacture / C : Construction / ES : Engineering Service / I : Install
[Doha Ph.1 SWRO] DAF Pilot System
[TUAS3 Desalination Plant] Saturator Vessel
[Putatan WTP] Saturator Vessel
[DTRI] DAF Pilot System
[DTRI] NBG Pilot System
[Rosarito] DAF Pilot System
Agitator
Air Bubble Piping
Drain Piping For Collection
Saturator Vessel
[Busan Gijang SWRO] Equipment For DAFB